Test certification Scrum n°6 (11) : 10 questions and answers

octobre 26, 2015

New Test (10 questions and answers)

QUESTION 1

What kind of software development projects can be executed by Scrum Project Management Framework?
Choice-1: Complete software packages
Choice-2: Customer projects
Choice-3: Sub-systems, components or parts of bigger systems
Choice-4: All kinds of software development projects
Choice-5: None of the given answers

Correct Answer: Choice-4 / All kinds of software development projects


QUESTION 2

What does NOT belong to cornerstones of the agile manifesto?
Choice-1: Individuals and interactions over processes and tools
Choice-2: Working software over comprehensive documentation
Choice-3: Processes over people
Choice-4: Customer collaboration over contract negotiation
Choice-5: Responding to change over following a plan

Correct Answer: Choice-3 / Processes over people


QUESTION 3

What is defined by the Scrum Framework?
A) Rules & Roles
B) Document guidelines
C) Artifacts and events
Choice-1: A
Choice-2: B
Choice-3: C
Choice-4: A, B, C
Choice-5: A, C

Correct Answer: Choice-5 / A, C


QUESTION 4

Where are the customer requirements stored?
Choice-1: In the Product Backlog
Choice-2: In the Sprint Backlog
Choice-3: In a database
Choice-4: In a Scrum Product Requirement Specification
Choice-5: Nowhere. The Scrum Product Owner knows them

Correct Answer: Choice-1 / In the Product Backlog


QUESTION 5

Which ones of the following main roles are defined by Scrum Framework?
A) Scrum Tester
B) The Scrum Team
C) Scrum Manager
D) Scrum Master
E) Scrum Product Owner
Choice-1: A, B, C, D, E
Choice-2: B, C, D, E
Choice-3: B, D, E
Choice-4: A, B, D, E
Choice-5: A, B, C, D

Correct Answer: Choice-3 / B, D, E


QUESTION 6

Which ones of the following main events are defined by Scrum Framework?
A) Sprint Planning Meeting
B) Sprint Retrospective Meeting
C) Sprint Review Meeting
D) Mid-Sprint Status Review Meeting
E) Daily Scrum Meeting
Choice-1: A, B, C, D, E
Choice-2: A, B, C, D
Choice-3: A, C, D, E
Choice-4: A, B, C, E
Choice-5: A, C, E

Correct Answer: Choice-4 / A, B, C, E


QUESTION 7

Which concept is NOT defined in the Scrum Framework?
Choice-1: Scrum Master
Choice-2: Project Manager
Choice-3: Scrum Product Owner
Choice-4: Daily Scrum
Choice-5: Scrum Product Burndown

Correct Answer: Choice-2 / Project Manager


QUESTION 8

What is important in all Scrum projects?
A) Self-organization
B) Clear hierarchies in the company
C) Communication
D) Continuous improvement
Choice-1: A, B, C, D
Choice-2: A, C, D
Choice-3: A, D
Choice-4: A
Choice-5: A, B

Correct Answer: Choice-2 / A, C, D


QUESTION 9

In software engineering what are the disadvantages of the classical waterfall model?
A) End-Product has to be fully anticipated beforehand.
B) Some requirements are implemented as defined in the beginning of the project, and yet they are not really needed by the customer.
C) Each phase is strictly separated.
Choice-1: A
Choice-2: B
Choice-3: C
Choice-4: A, B
Choice-5: A, B, C

Correct Answer: Choice-5 / A, B, C


QUESTION 10

What are the advantages of the Scrum Framework?
Choice-1: Fine-grained requirements are only defined when they are really needed.
Choice-2: All activities to design, build and test a certain functionality are kept together in one phase.
Choice-3: Changes are expected and welcomed by Scrum team.
Choice-4: All of the given answers
Choice-5: None of the given answers

Correct Answer: Choice-4 / All of the given answers

0

Test certification Scrum n°5 (10) : 10 questions and answers

octobre 26, 2015

New Test (10 questions and answers)

1.  The most encouraged time of day to hold a Scrum status meeting is:

A- 9AM
B- 11:30AM
C- Immediately after lunch
D- 4:30PM

Answer: A


2.  Scrum is a project management method for agile software development.
A- True
B- False

Answer: A


3.  The approach was first described by Takeuchi and Nonaka in « The New New Product Development Game. »
A- True
B- False

Answer: A


4.  How frequent are Scrum project status meetings recommended to be held?
A- daily
B- weekly
C- twice a day (morning and afternoon)
D- twice per week (Mondays and Thursdays)

Answer: B


5.  The product backlog is maintained by:
A- The Scrum Master
B- The Product Owner
C- Consulting Experts
D- The Scrum Team

Answer: B


6.  The person or persons in charge of the tracking and the updates for the scrum (equivalent to a project manager) is called the:
A- Product Owner
B- Scrum Master
C- Solo Scrum
D- Consulting Expert

Answer: B


7.  One of the goals of Scrum is to create a work environment where people are so focused on their tasks that they don’t mind working extra hours.
A- True
B- False

Answer: B


8.  A key principle of Scrum is its recognition that during a project, _____% of requirements change.
A- 10
B- 20-30
C- 30-50
D- 60-65

Answer: D


9.  The first description of the Scrum process noted that projects using large, highly structured teams produced the best results.
A- True
B- False

Answer: B


10.  In Scrum, the prioritized work to be done is referred to as:
A- standup meetings
B- sprint retrospective
C- sprint planning
D- product backlog

Answer: D

0

Test certification Scrum n°5 (9) : 10 questions

octobre 26, 2015

New Test (10 questions)

1.  The most encouraged time of day to hold a Scrum status meeting is:
A- 9AM
B- 11:30AM
C- Immediately after lunch
D- 4:30PM


2.  Scrum is a project management method for agile software development.
A- True
B- False


3.  The approach was first described by Takeuchi and Nonaka in « The New New Product Development Game. »
A- True
B- False


4.  How frequent are Scrum project status meetings recommended to be held?
A- daily
B- weekly
C- twice a day (morning and afternoon)
D- twice per week (Mondays and Thursdays)


5.  The product backlog is maintained by:
A- The Scrum Master
B- The Product Owner
C- Consulting Experts
D- The Scrum Team


6.  The person or persons in charge of the tracking and the updates for the scrum (equivalent to a project manager) is called the:
A- Product Owner
B- Scrum Master
C- Solo Scrum
D- Consulting Expert


7.  One of the goals of Scrum is to create a work environment where people are so focused on their tasks that they don’t mind working extra hours.
A- True
B- False


8.  A key principle of Scrum is its recognition that during a project, _____% of requirements change.
A- 10
B- 20-30
C- 30-50
D- 60-65


9.  The first description of the Scrum process noted that projects using large, highly structured teams produced the best results.
A- True
B- False


10.  In Scrum, the prioritized work to be done is referred to as:
A- standup meetings
B- sprint retrospective
C- sprint planning
D- product backlog

0

Test certification Scrum n°4 (8) : 10 questions and answers

octobre 26, 2015

Test (10 questions and answers)

1. Which one of the following is not a Scrum role?

A. Product Owner

B. ScrumMaster

C. Product Manager

D. Team

Answer: C


2. Which one of the following is not a Scrum Artifact?

A. Product Backlog

B. Story

C. Sprint Backlog

D. Increment of Potentially Shippable Product Functionality

Answer: B


3. Which of the following meeting is not part of Scrum?

A. Product review meeting

B. Sprint review meeting

C. Sprint planning meeting

D. Sprint retrospective meeting

Answer: A


4. What is the duration of a sprint in Scrum?

A. 4 weeks

B. 28-30 days

C. Anything between 2 4 weeks

D. 30 days

Answer: C


5. Which of the following questions is not relevant for regular Scrum Meeting?

A. What have you done since the last Daily Scrum regarding this project?

B. What will you do between now and the next Daily Scrum meeting regarding this project?

C. Would you be able to finish your work on time?

D. What impedes you from performing your work as effectively as possible?

Answer: C


6. Which one of the following is a popular certification associated with Scrum?

A. Scrum Certified

B. Certified Scrum Trainer

C. Certified ScrumManager

D. Certified ScrumMaster

Answer: D


7. What is a Burndown Graph?

A. A Sprint plan which is burned to celebrate successful completion of Sprint

B. The trend of work remaining across time in a Sprint, a release, or a product

C. The trend of work accomplished across time in a Sprint, a release, or a product

D. A Graph to measure human Burnout effect due to fast pace of sprint

Answer: B


8. Name the meeting during which the Team demonstrates to the Product Owner and any other interested parties what it was able to accomplish during the Sprint.

A. Sprint retrospective meeting

B. Product review meeting

C. Sprint review meeting

D. Stakeholder Review Meeting

Answer: C


9. Which one of the following is not a valid Scrum rule?

A. If the Team feels itself unable to complete all of the committed Product Backlog during the Sprint, it can consult with the Product Owner on which items to remove from the current Sprint.

B. The Team can seek outside advice, help, information, and support during the Sprint.

C. No one can provide advice, instructions, commentary, or direction to the Team during the Sprint. The Team is utterly self-managing.

D. If the Team determines that it can address more Product Backlog during the Sprint than it selected during the Sprint planning meeting, it can select and add new items from the product backlog.

Answer: D


10. Scrum is a very lean process with only 4 roles.

A. True

B. False

Answer: B

0

Test certification Scrum n°4 (7) : 10 questions

octobre 26, 2015

Test (10 questions)

1.      Which one of the following is not a Scrum role?

A.     Product Owner

B.     ScrumMaster

C.     Product Manager

D.     Team


2.      Which one of the following is not a Scrum Artifact?

A.     Product Backlog

B.     Story

C.     Sprint Backlog

D.     Increment of Potentially Shippable Product Functionality


3.      Which of the following meeting is not part of Scrum?

A.     Product review meeting

B.     Sprint review meeting

C.     Sprint planning meeting

D.     Sprint retrospective meeting


4.      What is the duration of a sprint in Scrum?

A.     4 weeks

B.     28-30 days

C.     Anything between 2 – 4 weeks

D.     30 days


5.      Which of the following questions is not relevant for regular Scrum Meeting?

A.     What have you done since the last Daily Scrum regarding this project?

B.     What will you do between now and the next Daily Scrum meeting regarding this project?

C.     Would you be able to finish your work on time?

D.     What impedes you from performing your work as effectively as possible?


6.      Which one of the following is a popular certification associated with Scrum?

A.     Scrum Certified

B.     Certified Scrum Trainer

C.     Certified ScrumManager

D.     Certified ScrumMaster


7.      What is a Burndown Graph?

A.     A Sprint plan which is burned to celebrate successful completion of Sprint

B.     The trend of work remaining across time in a Sprint, a release, or a product

C.     The trend of work accomplished across time in a Sprint, a release, or a product

D.     A Graph to measure human Burnout effect due to fast pace of sprint


8.      Name the meeting during which the Team demonstrates to the Product Owner and any other interested parties what it was able to accomplish during the Sprint.

A.     Sprint retrospective meeting

B.     Product review meeting

C.     Sprint review meeting

D.     Stakeholder Review Meeting


9.      Which one of the following is not a valid Scrum rule?

A.     If the Team feels itself unable to complete all of the committed Product Backlog during the Sprint, it can consult with the Product Owner on which items to remove from the current Sprint.

B.     The Team can seek outside advice, help, information, and support during the Sprint.

C.     No one can provide advice, instructions, commentary, or direction to the Team during the Sprint. The Team is utterly self-managing.

D.     If the Team determines that it can address more Product Backlog during the Sprint than it selected during the Sprint planning meeting, it can select and add new items from the product backlog.


10.      Scrum is a very lean process with only 4 roles.

A.     True
B.     False

0

Test certification Scrum n°3 (6) : 10 questions

octobre 23, 2015

Test scrum (10 questions)

Question 1 / 10

Which technique is a productive method for the ScrumMaster to use to help facilitate communication between the Team and Product Owner?

A. Teach the team to talk in terms of business needs and objectives

B.Teach the Product Owner about the technologies employed during the Sprints

C. Facilitate collaborative meetings between them

D. All of these


Question 2 / 10

What are the three components of an empirical process?

A. Feedback, courage, and simplicity

B. Planning, taking action, and checking for quality

C. Planning, committing, and measuring

D. Transparency, inspection, and adaptation


Question 3 / 10

After a Team has committed to a Sprint goal, what authority does it have?

A. The team has authority to swap Sprint backlog items with Product Backlog items if it cannot finish them

B. The team works according to the priorities set by the ScrumMaster, as the ScrumMaster is committed to the Scrum Framework.

C. The Team does whatever is necessary to achieve the goal.

D. The Team works under the authority of the Product Architect, who has set the definition of done.


Question 4 / 10

Once a team starts a Sprint, who determines how the team does its work?

A. Team lead

B. Project Manager

C. ScrumMaster

D. team


Question 5 / 10

Which statement is accurate about the role of the Product Owner during the Daily Scrum?

A.The Product Owner ensures the Burndown rate is maintained at the estimated rate.

B.The Product Owner’s participation is defined by the Team.

C.The Product owner outlines the additional changes that must be absorbed by the team in Sprint

D.The Product Owner provides instruction to the Team on how to implement a workable solution.


Question 6 / 10

What happens if, during a sprint, the Product Owner identifies a new, important Product Backlog item (PBI)?

A.The ScrumMaster encourages the Team to include the extra item

B.The Team works overtime to finish the PBI in the current sprint

C.The Product Owner adds the new PBI to the Product Backlog

D.The team extends the Sprint duration to include the new item


Question 7 / 10

If a Team member is consistently late for the Daily Scrum, what is usually the first thing a team should do?

A.Report the Team member to his or her manager

B.Meet with the Team member to determine a solution

C.Have the Team member do the testing

D.Ask the ScrumMaster to move the Team member off the Team.


Question 8 / 10

Why should the Product Owner attend the Daily Scrum?

A.To tell the Team which tasks to work on next and update the Product Backlog

B.To make sure the Team is still on target for its Sprint goals

C.To comment on the Team’s progress

D.To see the progress being made and determine whether the team needs help


Question 9 / 10

During a Daily Scrum meeting, Olivia mentions she has found some open source code she thinks will solve one of the problems she has been working on. She wants to implement it immediately. What is the best next step?

A.After the Daily Scrum meeting is held, a separate meeting is conducted to discuss the open source solution

B.All members of the Team are told to evaluate Olivia’s solution and report back to the team at the next Daily Scrum meeting

C.The Product Owner notes the impediment and solves the problem after the meeting.

D.The ScrumMaster tells Olivia to prepare an example and presentation for the Team so they can consider using the code.


Question 10 / 10

Who is primarily responsible for ensuring that everyone follows Scrum rules and practices?

A.The ScrumMaster

B.Each individual developer

C.All Team members collectively

D.The Product Owner

0

Test certification Scrum n°3 (5) : 10 questions and answers

octobre 23, 2015

Test (10 questions)

Question 1 / 10

Which technique is a productive method for the ScrumMaster to use to help facilitate communication between the Team and Product Owner?

A. Teach the team to talk in terms of business needs and objectives

B.Teach the Product Owner about the technologies employed during the Sprints

C. Facilitate collaborative meetings between them

D. All of these

Answer: D


Question 2 / 10

What are the three components of an empirical process?

A. Feedback, courage, and simplicity

B. Planning, taking action, and checking for quality

C. Planning, committing, and measuring

D. Transparency, inspection, and adaptation

Answer: D


Question 3 / 10

After a Team has committed to a Sprint goal, what authority does it have?

A. The team has authority to swap Sprint backlog items with Product Backlog items if it cannot finish them

B. The team works according to the priorities set by the ScrumMaster, as the ScrumMaster is committed to the Scrum Framework.

C. The Team does whatever is necessary to achieve the goal.

D. The Team works under the authority of the Product Architect, who has set the definition of done.

Answer: C


Question 4 / 10

Once a team starts a Sprint, who determines how the team does its work?

A. Team lead

B. Project Manager

C. ScrumMaster

D. team

Answer: D


Question 5 / 10

Which statement is accurate about the role of the Product Owner during the Daily Scrum?

A.The Product Owner ensures the Burndown rate is maintained at the estimated rate.

B.The Product Owner’s participation is defined by the Team.

C.The Product owner outlines the additional changes that must be absorbed by the team in Sprint

D.The Product Owner provides instruction to the Team on how to implement a workable solution.

Answer: B


Question 6 / 10

What happens if, during a sprint, the Product Owner identifies a new, important Product Backlog item (PBI)?

A.The ScrumMaster encourages the Team to include the extra item

B.The Team works overtime to finish the PBI in the current sprint

C.The Product Owner adds the new PBI to the Product Backlog

D.The team extends the Sprint duration to include the new item

Answer: C


Question 7 / 10

If a Team member is consistently late for the Daily Scrum, what is usually the first thing a team should do?

A.Report the Team member to his or her manager

B.Meet with the Team member to determine a solution

C.Have the Team member do the testing

D.Ask the ScrumMaster to move the Team member off the Team.

Answer: B


Question 8 / 10

Why should the Product Owner attend the Daily Scrum?

A.To tell the Team which tasks to work on next and update the Product Backlog

B.To make sure the Team is still on target for its Sprint goals

C.To comment on the Team’s progress

D.To see the progress being made and determine whether the team needs help

Answer: D


Question 9 / 10

During a Daily Scrum meeting, Olivia mentions she has found some open source code she thinks will solve one of the problems she has been working on. She wants to implement it immediately. What is the best next step?

A.After the Daily Scrum meeting is held, a separate meeting is conducted to discuss the open source solution

B.All members of the Team are told to evaluate Olivia’s solution and report back to the team at the next Daily Scrum meeting

C.The Product Owner notes the impediment and solves the problem after the meeting.

D.The ScrumMaster tells Olivia to prepare an example and presentation for the Team so they can consider using the code.

Answer: A


Question 10 / 10

Who is primarily responsible for ensuring that everyone follows Scrum rules and practices?

A.The ScrumMaster

B.Each individual developer

C.All Team members collectively

D.The Product Owner

Answer: A

0

Test certification Scrum n°2 (4) : 4 questions

octobre 23, 2015

Test scrum

Question 1
A line in the Agile Manifesto reads, « ____________ over following a plan ». Please select which option best completes the statement.
A. Communicating frequently
B. Completing requirements
C. Asking the customer
D. Responding to change


Question 2
_____________ can change the priority of items in the _________ backlog at any time.
A. The Product Owner(s); Sprint
B. The Team; Product
C. The Product Owner(s); Product
D. The Scrum Master; Sprint


Question 3
________________ constitute the Sprint Backlog and are often estimated in hours.
A. Stories
B. Use Cases
C. Features
D. Tasks


Question 4
A _____________________ is created during the first half of the Sprint planning meeting and a _________________ is created during the second half of the Sprint planning meeting?
A. Sprint Backlog, collection of tasks
B. Product Backlog, collection of tasks
C. Sprint Goal, Sprint Backlog
D. Product Backlog, Sprint Backlog

 

0

Test certification Scrum n°2 (3) : 4 questions and answers

octobre 23, 2015

Test scrum

Question 1
A line in the Agile Manifesto reads, « ____________ over following a plan ». Please select which option best completes the statement.
A. Communicating frequently
B. Completing requirements
C. Asking the customer
D. Responding to change

Answer: D

Summary
A line in the Agile Manifesto reads, « ____________ over following a plan ». This is intended to mean that agile development is highly adaptive and focused on quick responses to change and continuous development.


Question 2
_____________ can change the priority of items in the _________ backlog at any time.
A. The Product Owner(s); Sprint
B. The Team; Product
C. The Product Owner(s); Product
D. The Scrum Master; Sprint

Answer: C

Summary
The Product Owner(s) can change the priority of items in the Product backlog at any time. The Product Backlog is continuously updated by the Product Owner(s) to reflect changes in the needs of the customer.


Question 3
________________ constitute the Sprint Backlog and are often estimated in hours.
A. Stories
B. Use Cases
C. Features
D. Tasks

Answer: D

Summary
Tasks constitute the Sprint Backlog and are often estimated in hours. Alternate choices: Use cases are used for either requirements. A task may be to create use cases. Stories, also known as Storycards, are what may be used to document the product backlog item. Features requested by Product Owners are generally expressed in the Product Backlog as one or more storycards.


Question 4
A _____________________ is created during the first half of the Sprint planning meeting and a _________________ is created during the second half of the Sprint planning meeting?
A. Sprint Backlog, collection of tasks
B. Product Backlog, collection of tasks
C. Sprint Goal, Sprint Backlog
D. Product Backlog, Sprint Backlog

Answer: C

Summary
A Sprint Goal is created during the first half of the Sprint planning meeting and a Sprint Backlog is created during the second half of the Sprint planning meeting

0

Test certification Scrum n°1 (2) : 24 questions and answers

octobre 23, 2015

Scrum test (24 questions)

1- If you are truly doing scrum, you should release to production at the end of each sprint.
A-True
B-False

Answer : B


 

2- What is the most effective way to order the product backlog ?
A-it is up to the Product Owner to decide.
B-Risk
C-Complexity
D-Size

Answer : A


 

3- Time can be allocated between sprints for integration testing.
A-True
B-False

Answer : B


 

4- In scrum teams decide which events take place during a sprint.
A-True
B-False

Answer : B


 

5- Which two things do not occur in the first sprint ?
A-Develop the complete architecture.
B-Finalize the complete product backlog
C-Develop something of value to the customer.
D-Create potentially release software.

Answer : A, B


 

6- Who is responsible for maximizing the value of the product backlog ?
A-Customer
B-Product owner
C-Product owner and team
D-Scrum Master and product owner

Answer : B


 

7- What type of process in scrum ?
A-Empirical
B-Classical
C-Inspection
D-Adaptative

Answer : A


 

8- In what ways do the product owner manage the value of the product ?
(pick two)
A- User acceptance testing
B- Product Backlog order
C- MoSCoW analysis
D- Customer feedback via frequent releases

Answer : B, D


 

9- What are two ways in which the Product Owner manage Inspection of the increment ?
A- By presenting the status of the Product Backlog at the Sprint Review
B- By reviewing it during Product Backlog Refinement
C- By inviting stakeholders to give feedbacks during the Sprint Review
D- By attending the Sprint Retrospective

Answer : A, C


 

10- Work that does not meet the definition of Done should be completed in the next Sprint.
A- False
B- True

Answer : A


 

11- Which of the following terms are optional in Scrum ? (pick two)
A- Burdown
B- Definition of Done
C- Backlog
D- Increment
E- Velocity

Answer : A, E


 

12- When is a sprint finished ?
A- When the time-boxed duration is met
B- When the Product Owner accepts the Increment
C- When the definition of Done is met
D- When the work remaining is zero

Answer : A


 

13- Who tracks work remaining in the Product Bcklog ?
A- Scrum Master
B- Development Team
C- Product Owner
D- Senior executives

Answer : C


 

14- What scrum event or artifact is the single source of requirements for any change to be made for the product ?
A- Daily Scrum
B- Increment
C- Product Backlog
D- Scrum
E- Sprint

Answer : C


 

15- The Product Owner must frequently review Scrum artifacts and progress toward a Sprint Goal to detect indesirables variances. Which pillar of Scrum does this represent ?
A- Transparency
B- Inspection
C- Adaptation

Answer : B


 

16- What is the standard time for the Daily Scrum?
1. 5 minutes
2. 15 minutes
3. 30 minutes
4. As long as it takes

Answer : 2


 

17- The company director approaches a member of the development team to add some new functionality in to the current Sprint. What should they do?
1. Add it in to the Sprint
2. Add it in to the Sprint and remove a similar sized piece of work
3. Add it in to the next Sprint
4. Inform the Product Owner and get the two talking asap

Answer : 4

Explanation:
You need to resist changes to scope mid-Sprint – this breaks the committment between The Team and the Product Owner. A developer really needs to let the Product Owner deal with this as it is their domain. May be the director is not aware that this functionality is not required, or it is lower in priority. Either way it is best that those two thrash it out first without immediately changing direction mid-Sprint which is not good practice.


 

18- Scrum is the appropriate weapon of choice for any kind of software development?
1. true
2. false

Answer : 2

Explanation:
Scrum is great for tackling large, complex and/or risky projects. But if you have a small, easy and/or predictable project you might like to just crack out the waterfall. Surprising answer – but true. Also, let me know where you work because I have rarely find such projects – but then again they do sound a bit boring.


 

19- How should the Product backlog be organised?
1. Longer tasks at the top
2. Easier tasks at the top
3. Most important at the top
4. Randomly

Answer : 3

Explanation:
The Product backlog must be organised in to business priority. It is sometimes necessary to rejuggle according to risk and size, but ultimately the business case for each task takes priority.


 

20- Which of the following is NOT an artifact in a typical Scrum project?
1. Product backlog
2. Gantt chart
3. Sprint backlog
4. Burndown char

Answer : 2

Explanation:
There is still some debate as to whether there are three or four artifacts. However it can be said with certainty that a Gantt chart is NOT a typical Scrum artifact. The Scrum Primer, MountainGoatSoftware.com, and Do Better Scrum all include the product backlog, sprint backlog, and burndown charts in their lists of artifacts.


 

21- Which of the following is NOT a Scrum role?
1. Project manager
2. Team
3. ScrumMaster
4. Product owner

Answer : 1

Explanation:
Mike Cohn discusses in Chapter 8 of Succeeding with Agile, how former Project Managers need to change to become effective Scrum Masters.
From Do Better Scrum: « The responsibilities of the traditional project manager are divided over the three roles in the Scrum Team:
The Product Owner manages the product (and return on investment)
The ScrumMaster manages the process
The team manages itself. »


 

22- A Sprint planning meeting happens everyday at the same time and place. True or false?
1. True
2. False

Answer : 2

Explanation:
This describes the Daily Scrum. A Sprint planning meeting occurs at the beginning of each Sprint with the view to organise the work for that Sprint.


 

23- How will The Team know when a backlog item is completed?
1. The test team say it is completed
2. The ScrumMaster says it is completed
3. It meets the team and product owner’s negotiated definition of done
4. When the Sprint is completed
5. None of the above

Answer : 3

Explanation:
It is important to learn that the Sprint planning meeting is the time and place where The Team and the Product Owner need to agree what will constitute « done » for each Spring backlog item. Everything follows from this. An experienced ScrumMaster will sniff out any discussions or ideas that will deviate from this agreement.


 

24- In the ‘Manifesto for Agile Software Development’, ‘Working software’ is preferred over which of the following?
1. Processes and tools
2. Project managers
3. Comprehensive documentation
4. No documentation

Answer : 3

0

Test certification Scrum n°1 (1) : 24 questions

octobre 23, 2015

Scrum test (24 questions)

1- If you are truly doing scrum, you should release to production at the end of each sprint.

A-True

B-False


2- What is the most effective way to order the product backlog ?

A-it is up to the Product Owner to decide.

B-Risk

C-Complexity

D-Size


3- Time can be allocated between sprints for integration testing.

A-True

B-False


4- In scrum teams decide which events take place during a sprint.

A-True

B-False


5- Which two things do not occur in the first sprint ?

A-Develop the complete architecture.

B-Finalize the complete product backlog

C-Develop something of value to the customer.

D-Create potentially release software.


6- Who is responsible for maximizing the value of the product backlog ?

A-Customer

B-Product owner

C-Product owner and team

D-Scrum Master and product owner


7- What type of process in scrum ?

A-Empirical

B-Classical

C-Inspection

D-Adaptative


8- In what ways do the product owner manage the value of the product ?

(pick two)

A- User acceptance testing

B- Product Backlog order

C- MoSCoW analysis

D- Customer feedback via frequent releases


9- What are two ways in which the Product Owner manage Inspection of the increment ?

A- By presenting the status of the Product Backlog at the Sprint Review

B- By reviewing it during Product Backlog Refinement

C- By inviting stakeholders to give feedbacks during the Sprint Review

D- By attending the Sprint Retrospective


10- Work that does not meet the definition of Done should be completed in the next Sprint.

A- False

B- True


11- Which of the following terms are optional in Scrum ? (pick two)

A- Burdown

B- Definition of Done

C- Backlog

D- Increment

E- Velocity


12- When is a sprint finished ?

A- When the time-boxed duration is met

B- When the Product Owner accepts the Increment

C- When the definition of Done is met

D- When the work remaining is zero


13- Who tracks work remaining in the Product Bcklog ?

A- Scrum Master

B- Development Team

C- Product Owner

D- Senior executives


14- What scrum event or artifact is the single source of requirements for any change to be made for the product ?

A- Daily Scrum

B- Increment

C- Product Backlog

D- Scrum

E- Sprint


15- The Product Owner must frequently review Scrum artifacts and progress toward a Sprint Goal to detect indesirables variances. Which pillar of Scrum does this represent ?

A- Transparency

B- Inspection

C- Adaptation


16- What is the standard time for the Daily Scrum?

  1. 5 minutes
  2. 15 minutes
  3. 30 minutes
  4. As long as it takes

 

17- The company director approaches a member of the development team to add some new functionality in to the current Sprint. What should they do?

  1. Add it in to the Sprint
  2. Add it in to the Sprint and remove a similar sized piece of work
  3. Add it in to the next Sprint
  4. Inform the Product Owner and get the two talking asap

 

18- Scrum is the appropriate weapon of choice for any kind of software development?

  1. true
  2. false

19- How should the Product backlog be organised?

  1. Longer tasks at the top
  2. Easier tasks at the top
  3. Most important at the top
  4. Randomly

20- Which of the following is NOT an artifact in a typical Scrum project?

  1. Product backlog
  2. Gantt chart
  3. Sprint backlog
  4. Burndown char

21- Which of the following is NOT a Scrum role?

  1. Project manager
  2. Team
  3. ScrumMaster
  4. Product owner

22- A Sprint planning meeting happens everyday at the same time and place. True or false?

  1. True
  2. False

23- How will The Team know when a backlog item is completed?

  1. The test team say it is completed
  2. The ScrumMaster says it is completed
  3. It meets the team and product owner’s negotiated definition of done
  4. When the Sprint is completed
  5. None of the above

24- In the ‘Manifesto for Agile Software Development’, ‘Working software’ is preferred over which of the following?

  1. Processes and tools
  2. Project managers
  3. Comprehensive documentation
  4. No documentation
0

PMP® exam is changing in 2015

juillet 30, 2015

The PMP exam is changing in 2015 (November 1), what this means :
– A recently completed Role Delineation Study (RDS) provided an updated description of the project management professional role. Research included a large-scale survey of global Project Management Professional (PMP)® certification holders to validate updates to domains, tasks, knowledge, and skills.

– The RDS captures perspectives of project management practitioners from all industries, work settings, and regions.

– It serves as the foundation for the PMP exam and ensures its validity and relevance.

PMP_exam_changes_150730

PMP exam changes 2015

How the PMP® is affected

The five domains of practice for the PMP remain the same. However, tasks within each domain have been modified, added, or removed.

To view all the changes in detail, see the Exam Content Outline.

 

0

Protégé : Scrum or not scrum ? (1)

juillet 13, 2015

Cette publication est protégée par un mot de passe. Pour la voir, veuillez saisir votre mot de passe ci-dessous :

Saisissez votre mot de passe pour accéder aux commentaires.

Scrum : conférence de présentation du framework Agile Scrum

juillet 13, 2015

Une intervention pour présenter le framework SCRUM dans une conférence/débat.FAB_presentateur

http://www.google.fr/imgres?imgurl=https%3A%2F%2Fmedia.licdn.com%2Fmpr%2Fmpr%2Fshrink_200_200%2Fp%2F3%2F000%2F05d%2F136%2F1be2176.jpg&imgrefurl=https%3A%2F%2Ffr.linkedin.com%2Fpub%2Ffrancois-bureau-pmp-coach-team%2F1a%2F71a%2F31a&h=200&w=200&tbnid=9S4zPrUz7RufOM%3A&zoom=1&docid=byEZsHoPlm2b8M&ei=N7d0VfeYA8P2UKqDg7gB&tbm=isch&client=firefox-a&iact=rc&uact=3&dur=3540&page=1&start=0&ndsp=25&ved=0CEoQrQMwDg

 

url

0

Business Value Analysis Management (01)

juillet 13, 2015

Value Stream Mapping Analysis

Un exemple d’analyse de la valeur pratico-pratique dans le sketch  » Les Oranges  » de Mr Fernand RAYNAUD :

voir le texte ici

et la vidéo

0